Preparation Is Where A Rubber Surfacing Job Is Won Or Lost
On most jobs the whole first day goes to the slab, not the rubber, because poured rubber surfacing only lasts as long as its bond. The slab is pressure washed or ground down, sealer and paint come off, and each crack that still moves gets repaired. Hairline and static cracks are left alone; the rubber is flexible and bridges them.
The slab has to be dry before it is primed. On the clay plain south of Rossland Road that can mean waiting a day after rain. On the moraine sand north of Brooklin it drains faster. We do not pour rubber surfacing on a damp or dusty surface, because that is the job that peels.
Two Granules And Two Binders, Each With Its Own Job
Where colour shows we use EPDM granules; where black is wanted, or a cushion goes under a top layer, we use SBR. EPDM is fresh rubber, coloured through the whole granule, and it holds that colour in sun. SBR is ground from old tires, black and cheaper, and it is the right rubber surfacing for garage floors, gyms and playground bases.
The binder is polyurethane. Aromatic binder costs less and can amber a pale colour where the sun is strong. Aliphatic binder costs more and does not yellow, so we price it on pale pool decks and walkways. The quote says which binder the rubber surfacing is priced on.
Where Whitby Rubber Surfacing Works
We work throughout the Town of Whitby, which since 1968 has included Brooklin, Ashburn and Myrtle in the north as well as Port Whitby, Downtown Whitby, Pringle Creek, Blue Grass Meadows, Lynde Creek, Williamsburg, Rolling Acres and Taunton North. Ajax is a short run west along the 401 and Pickering is just past it.
The surfaces change across that area. Lakeshore streets have the oldest pool decks and the clay that heaves them. The newer subdivisions in Williamsburg, Taunton North and Brooklin have stamped concrete and interlock. The farms north of the 407 have barns. Rubber surfacing goes on all of them.
How A Rubber Surfacing Price Is Arrived At
We price every job from a site visit and a tape measure, never from a photo alone. The area is measured, the use sets the depth, the colour and binder are chosen, and the preparation needed on that slab is assessed. Those four things set the price, and all four are written into the quote.
Across Durham Region, covering an existing pool deck, patio, garage floor or flight of steps with rubber surfacing commonly costs $8 to $16 a square foot; playgrounds run $15 to $30 and up, since they are so much deeper. There is a minimum charge on small jobs.